FACTORY OUTLINE

The factory building is highly heat-insulating, airtight and can be used for the manufacture of highly precise electronic parts etc. Floor load capacity is 5t/㎡, interior construction is also done separately, so you can arrange the interior work in the factory. There are also a track records of installation of machine foundation etc.  Normally, an additional office, which is required separately, is added to the factory building from the beginning. In addition, there are the installed toilets and washrooms in the factory and in the office. We offer 24 hours maintenance supports  by our professional technical team.  So we provide the customized support depending on a customer's request.

RENTAL FACTORY OVERVIEW

Pho Noi A Industrial Park
(IDI 1st Rental Factory)
Pho Noi A Industrial Park
(IDI 3rd Rental Factory)
Hoa Mac Industrial Park
(AMV Rental Factrory)
 Address Hung Yen Province,Pho Noi A Industrial Park Hung Yen Province,Pho Noi A Industrial Park Ha Nam Province, Hoa Mac Industrial Park
 Location 24km from Hanoi city(60min by car)
60km from Noi bai airport(60min
75km from Hai Phong port(120min)
 24km from Hanoi city(60min by car)
60km from Noi bai airport(60min
75km from Hai Phong port(120min)
 45㎞ from Hanoi city(70min by car)
75㎞ from Noi bai airport(90min)
100㎞ from Hai Phong port(120min)
 Population About 1.15million ((Hung Yen Province) About 1.15million ((Hung Yen Province) About 0.8million (Ha Nam Province)
 Rental fee 4.0USD/m2/month 4.0USD/m2/month 4.0USD/m2/month
 Administration fee 0.5USD/m2/month 0.5USD/m2/month 0.5USD/m2/month
 Method of payment Every month Every month Every month
 Factory site 900~2,300m2×9buildings
             Minimum Rental Area 900m2~2,300m2
 3,000m2~5,000m2 ×7buldings
               Minimum Rental Area 1,000m2~Asking
 3,000m2×5buildings
                        Minimum Rental Area 1,000m2~Asking